Fundamental information

Projects in keep.eu / partners on map

EU funding (sum of EU funding of projects in keep.eu)

Excluding technical assistance

EUR 74 117 008.00 (75 348 068.09)

Total budget

Excluding technical assistance

EUR 87 196 480.00

Funding instrument(s)

ERDF

Eligible geographical area

Open map
  • HU Hungary / Magyarország (Győr-Moson-Sopron, Vas, Zala)
  • AT Austria / Österreich (Graz, Mittelburgenland, Niederösterreich-Süd, Nordburgenland, Oststeiermark, Südburgenland, Wien, Wien, Wiener Umland/Südteil)

Objectives, priorities and indicators

Specific objective : Enhancing sustainable mobility on the local and regional level

Thematic objective and investment priority

  • (07) promoting sustainable transport and removing bottlenecks in key network infrastructures by:
    • (07c) developing and improving environmentally-friendly (including low-noise) and low-carbon transport systems, including inland waterways and maritime transport, ports, multimodal links and airport infrastructure, in order to promote sustainable regional and local mobility

Result indicator (measurement unit)

  • Intermodal public transport nodes (Number)

Output indicator (measurement unit)

  • O1: Jointly developed strategies, transport concepts and actions (action 1,2,3,4,5) (Number)
  • O2: Joint schemes for promoting environmentally friendly transport (action 6,7) (Number)
Specific objective : Improving cross-border connectivity of regional centres to the TEN-T network

Thematic objective and investment priority

  • (07) promoting sustainable transport and removing bottlenecks in key network infrastructures by:
    • (07b) enhancing regional mobility by connecting secondary and tertiary nodes to TEN-T infrastructure, including multimodal nodes

Result indicator (measurement unit)

  • Average travel time (individual transport) to a node with TEN-T network connection (Minutes)

Output indicator (measurement unit)

  • O1: Pre-investment studies (Number)

Common output indicator (measurement unit)

  • CO1: Total length of newly built roads (Km)
  • CO2: Total length of reconstructed or upgraded roads (Km)
  • CO3: Total length of reconstructed or upgraded railway line (Km)
Specific objective : Improving institutional cross-border cooperation in order to strengthen the integration

Thematic objective and investment priority

  • (11) enhancing institutional capacity of public authorities and stakeholders and efficient public administration through actions to strengthen the institutional capacity and the efficiency of public administrations and public services related to the implementation of the ERDF, and in support of actions under the ESF to strengthen the institutional capacity and the efficiency of public administration.
    • (11 ETC) ETC specific, for cross-border cooperation: enhancing institutional capacity of public authorities and stakeholders and efficient public administration by promoting legal and administrative cooperation and cooperation between citizens and institutions

Result indicator (measurement unit)

  • Level of cooperation quality in the border region (Percent of highest rating)

Output indicator (measurement unit)

  • O1: Actors involved in cross-border cooperation (action 1,2,3,4,5) (Number)
  • O2: Joint cross-border cultural, educational, recreational and other type of community events and actions (“people to people”) (action 4) (Number)

Common output indicator (measurement unit)

  • CO1: Number of participants in joint education and training schemes to support youth employment, educational opportunities and higher and vocational education across borders (Persons)
Specific objective : Improving the ecological stability and resilience of landscape and ecosystems

Thematic objective and investment priority

  • (06) preserving and protecting the environment and promoting resource efficiency by:
    • (06d) Protecting and restoring biodiversity and soil and promoting ecosystem services, including through Natura 2000, and green infrastructure

Result indicator (measurement unit)

  • Conservation degree A (of all habitat types in the Natura 2000 sites of the programme region) (Percent)

Output indicator (measurement unit)

  • O1: Jointly developed protection and management plans (action 1) (Number)
  • O2: Protection measures (including investments) (action 2) (Number)
  • O3: Joint research projects (action 3) (Number)
  • O4: Participants in joint training schemes and awareness raising programmes (action 4) (Number)

Common output indicator (measurement unit)

  • CO1: Surface area of habitats supported in order to attain a better conservation status (Hectares)
Specific objective : Improving the management and protection of water bodies

Thematic objective and investment priority

  • (06) preserving and protecting the environment and promoting resource efficiency by:
    • (06f) promoting innovative technologies to improve environmental protection and resource efficiency in the waste sector, water sector and with regard to soil, or to reduce air pollution

Result indicator (measurement unit)

  • Chemical and ecological condition of border water bodies classified as “good” and “very good” (Number)

Output indicator (measurement unit)

  • O1: Jointly developed pilots and infrastructures (Number)
  • O2: Measures securing or improving the status of water bodies in qualitative and quantitative terms (Number)

Common output indicator (measurement unit)

  • CO1: Number of research institutions participating in cross-border, transnational or interregional research projects (Organisations)
Specific objective : Improving the protection, promotion and development of natural and cultural heritage through common approaches to sustainable tourism

Thematic objective and investment priority

  • (06) preserving and protecting the environment and promoting resource efficiency by:
    • (06c) Conserving, protecting, promoting and developing natural and cultural heritage

Result indicator (measurement unit)

  • Overnight stays (Number)

Output indicator (measurement unit)

  • O1: Jointly developed strategies and action plans and capacity building measures (action 1) (Number)
  • O2: Jointly developed investments at cultural and natural heritage sites (action 1,2) (Number)
  • O3: Common offers (action 2,3) (Number)
Specific objective : Strengthening intercultural capacities and labour mobility of the border population by supporting cross-border education initiatives and vocational training

Thematic objective and investment priority

  • (11) enhancing institutional capacity of public authorities and stakeholders and efficient public administration through actions to strengthen the institutional capacity and the efficiency of public administrations and public services related to the implementation of the ERDF, and in support of actions under the ESF to strengthen the institutional capacity and the efficiency of public administration.
    • (11 ETC) ETC specific, for cross-border cooperation: enhancing institutional capacity of public authorities and stakeholders and efficient public administration by promoting legal and administrative cooperation and cooperation between citizens and institutions

Result indicator (measurement unit)

  • Institutions involved in cross-border education schemes (Number)

Output indicator (measurement unit)

  • O1: Actors involved in cross-border cooperation (action 1,2,3,4,5) (Number)
  • O2: Joint cross-border cultural, educational, recreational and other type of community events and actions (“people to people”) (action 4) (Number)

Common output indicator (measurement unit)

  • CO1: Number of participants in joint education and training schemes to support youth employment, educational opportunities and higher and vocational education across borders (Persons)
Specific objective : Strengthening regional entrepreneurship, the performance of start-ups and the innovation capacities of SMEs with a focus on the development of (internationally) competitive products

Thematic objective and investment priority

  • (03) enhancing the competitiveness of SMEs by:
    • (03d) supporting the capacity of SMEs to grow in regional, national and international markets, and to engage in innovation processes

Result indicator (measurement unit)

  • Survival rate of enterprises after 3 years (Percent)

Output indicator (measurement unit)

  • O1: SMEs involved in cooperation projects (action 1,2) (Number)
  • O2: Intermediate organisations involved in cooperation projects (action 3) (Number)

Information on this programme's project and partner data in keep.eu

Latest month of project-partner-call data publication

10-2021

Language of the data in keep.eu

English, German, Hungarian

(see challenge of language detection)

No. of projects in keep.eu / Total no. of projects (% of projects in keep.eu)

61 / 61 (100%)

No. of project partners in keep.eu / Total no. of project partners (% of project partners in keep.eu)

244 / 244 (100%)

Notes on the data

Information provided by the Programme. Fields project name (from 43 projects) translated from German into English using the European Commission's eTranslation machine translation service.

The projects which fields do not include an eTranslation English text are the ones with the following acronyms: AgriNatur AT-HU, border(hi)stories, CEPI, CODES AT-HU, ConnReg AT-HU, EDLRIS, ENARIS, Fairwork, HEAL NOW, IMPROVE!, Joint Ambrosia Action, PLATFORM, REBEN, REIN-Forest, SAM, SMART-Pannonia, SMART-UP and WomEn-Puls.

The financial data featured in keep.eu for this programme, it's projects and its partners is not exact and should be taken as a reference only.