“ESTABLISHMENT OF A NEW BORDER CROSS CHECK POINT (BCCP) STRUMYANI-BEROVO (“KLEPALO”) BETWEEN BULGARIA AND NORTH MACEDONIA”
Programme 2021 - 2027 Interreg VI-A IPA Bulgaria North MacedoniaDescription
Thematic information
Priority: (VI-A_BG-NM_2) Priority 2: More connected border region
Priority specific objective: RSO3.1. Developing a climate resilient, intelligent, secure, sustainable and intermodal TEN-T
Priority policy objective (Interreg specific objective): PO3 A more connected Europe by enhancing mobility
Type of intervention: 093 Other reconstructed or modernised roads (motorway, national, regional or local)
Partners (2)
Lead Partner: Областна администрация Благоевград
Partner’s ID if not PIC: 101146105
Address: "Georgi Izmirliev" Sq. , 2700 Blagoevgrad, Bulgaria
Legal status: public
Organisation type: Regional public authority
Website: http://www.blagoevgrad.government.bg
Total budget: EUR 7 450 694.62
Partner’s programme co-financing: EUR 4 509 905.45
Partner’s programme co-financing rate: 61.00%
Partner contribution: EUR 2 940 789.17
- Министерство за финанисии - Царинска управа на Република Северна Македониja
-
Name: Министерство за финанисии - Царинска управа на Република Северна Македониja
Partner’s ID if not PIC: 4030992228017
Address: "Lazar Lichenoski", 1000 Skopje, North Macedonia
Legal status: public
Organisation type: National public authority
Website: http://www.customs.gov.mk
Total budget: EUR 3 676 987.93
Partner’s programme co-financing: EUR 3 125 439.74
Partner’s programme co-financing rate: 85.00%
Partner contribution: EUR 551 548.19
Partners map

Lead partner

Project partner
Summary
Operation of strategic importance (OSI) or above EUR 5 million
Project acronym: BCCP-Klepalo
Project ID: BGMK0100002
Project start date: 2023-11-18
Project end date: 2029-11-17
Project status: ongoing
Relevant linked projects:
- 1. North Macedonia – Bulgaria CVIII Rail Interconnection
- (Beljakovce – Kriva Palanka)
- 2. Bulgaria Railway modernization (EN) | Implementation of a railway connection is set between Bulgaria and North Macedonia, as well as modernization of section Sofia-Pernik-Radomir and completion of modernization of section Elin Pelin-Kostenets.
- The expected outcomes of the BCCP project, together with those of the North Macedonia – Bulgaria CVIII Rail Interconnection (Beljakovce – Kriva Palanka), significantly contribute to the overall efforts for improving mobility and connectivity along the Orient/East-Med Corridor by facilitating regional trade, reducing travel times (including to destinations outside the CBC area) and bringing great benefits for local citizens and businesses in the region. (EN), Struma Highway, Republic of Bulgaria (EN) | The interventions synergies refer to achieving improved access to the core TEN-T network.
- Struma Highway is part of the Trans-European transport network in the direction of the Pan-European Transport Corridor IV in the section from the "Daskalovo" road junction to the Kulata border crossing. The construction of the highway is co-funded by the EFRD&CF of the EU.
- The new access road to pass trough the Bulgarian BCCP to the border of the Republic of North Macedonia will be linked to the existing road connection to Struma Highway.
- The envisaged expansion of access to the main TEN-T network by providing a direct road connection to the Struma Motorway in Bulgaria, and connection with main Orient/East-Med Corridor VIII will strengthen regional connectivity and cross-border mobility. (EN), Reconstruction and modernization Stanke Lesichkovo BCCP, Republic of Bulgaria (EN) | Currently the Republic of Bulgaria represented by their Customs Agencies performs a large investment projects on reconstruction and modernization of the facilities of Stanke Lesichkovo - Delchevo BCCP which is one of the existing 3 BCCPs on the border line. The reconstruction will allow applying the most up-to-date standards in safeguarding security and border control systems and facilitate the traffic flow between the countries, providing good environment for tourism, industrial and economic development, connecting the Ohrid lake to the Bulgarian Border.
- Those investment projects will provide the needed synergies to tackle identified common challenges in the CBC area. (EN), Renovated and upgraded Border crossing points with Bulgaria in line with the EU standards (BCP Delchevo) – IPA III (2021 – 2027), Republic of North Macedonia (EN) |
- North Macedonia has invested considerable resources in improving the physical border infrastructure along the Corridor X, while the existing facilities and infrastructure at the borders with Bulgaria i.e. Corridor VIII, remain rudimentary. This involves two border-crossing points, at Deve Bair and Delcevo. The obsolete infrastructure and lack of support facilities impact on the effectiveness and efficiency of the customs controls and delay the cross-border flow of goods. The renovation and upgrading of the Border Crossing Points (BCP) with the EU will ensure smoother border traffic for legal businesses and passengers with the EU. In the frame of the Action Document for “EU against organised crime, in support of trade” for IPA III for 2021 an investment into construction, reconstruction and rehabilitation activities at the border crossing with Bulgaria Delcevo will take place, For Delcevo, the reconstruction process involves renovation of 1100 m2 of the border control station, wastewater treatment station construction, and reconstruction of supporting roads and truck parking terminals of 5500 m2. It is expected this activity to start at the end of the year 2023 (EN), Reconstruction of the Deve Bair Border Crossing Point, Republic of North Macedonia (EN) | Due to the growing international importance of the Deve Bair highway and the increased frequency of passenger and goods traffic, the new project will expand the BCP with the construction of two additional lanes at the entrance from the Republic of North Macedonia. The administrative building at the BCP and the access road to the terminal for heavy vehicles will also be reconstructed to ensure uninterrupted use in winter conditions. As part of the project, a new wastewater treatment plant will be built, and a new truck weighbridge will be installed. The activity financed by World Bank is expected to be completed at the beginning of the 2025. (EN)
Total budget/expenditure: EUR 11 127 682.55
Total EU funding (amount): EUR 7 635 345.19
Total EU funding (co-financing rate): 68.62%
Co-financing sources:
- IPA/IPA II/IPA III: Amount, EUR 7 635 345.19. Co-financing rate, 68.62%.
Investments, deliverables, policy contributions
(bullets are inserted automatically and may be incorrectly placed)
Infrastructure investments:
- I3.8 - BG Construction works supervision - Bulgaria - EUR 104 303.54 - country: Bulgaria (BG), town: Strumyani, street: N/A, N/A, postal_code: 2825, Yugozapaden (BG41), Blagoevgrad (BG413)
- I3.1 - MKD BCCP Berovo - North Macedonia - EUR 3 031 738.43 - country: Severna Makedonija (MK), town: Berovo, street: N/A, N/A, postal_code: 2330, Severna Makedonija (MK00), Istočen (MK002)
- I3.3 - MKD Supervision of works- North Macedonia - EUR 101 057.56 - country: Severna Makedonija (MK), town: Berovo, street: N/A, N/A, postal_code: 2330, Severna Makedonija (MK00), Istočen (MK002)
- I3.4 - MKD Putting into operation - North Macedonia - EUR 2 000.00 - country: Severna Makedonija (MK), town: Berovo, street: N/A, N/A, postal_code: 2330, Severna Makedonija (MK00), Istočen (MK002)
- I3.6 - BG BCCP Strumyani facility - Bulgaria - EUR 6 379 536.04 - country: Bulgaria (BG), town: Strumyani, street: N/A, N/A, postal_code: 2825, Yugozapaden (BG41), Blagoevgrad (BG413)
- I3.7 - BG Author's supervision - Bulgaria - EUR 30 677.51 - country: Bulgaria (BG), town: Strumyani, street: N/A, N/A, postal_code: 2825, Yugozapaden (BG41), Blagoevgrad (BG413)
- I3.9 - BG Investor's Control - Bulgaria - EUR 61 355.03 - country: Bulgaria (BG), town: Strumyani, street: N/A, N/A, postal_code: 2825, Yugozapaden (BG41), Blagoevgrad (BG413)
- I3.10 - BG Putting into operation - Bulgaria - EUR 6 250.00 - country: Bulgaria (BG), town: Strumyani, street: N/A, N/A, postal_code: 2825, Yugozapaden (BG41), Blagoevgrad (BG413)
- I3.11 - MKD Designer's supervision - North Macedonia - EUR 35 400.00 - country: Severna Makedonija (MK), town: Berovo, street: N/A, N/A, postal_code: 2330, Severna Makedonija (MK00), Istočen (MK002)
Deliverables:
- BG Public procurement
- procedure for communication and visibility measures
- BG Public procurement procedure for Environmental procedures
- BG Technical specification for design and authors' supervision, construction works.
- BG technical specification for CA and construction supervision
- BG technical specification for investor's control
- BG Public procurement documentation for design and authors' supervision, construction works.
- BG Public procurement documentation for CA and construction supervision
- BG Public procurement documentation for investor's control
- BG Public procurement procedure/s for design and authors' supervision, construction works.
- BG Public procurement procedure for consulting services - CA and construction supervision
- BG Public procurement procedure for consulting services - investor's control
- BG Legal/ procurement expert report
- BG Technical expert report
- BG Investment proposal announcement
- BG Consultations for defining the scope of the EIA&AA
- BG EIA&AA Scoping Report
- BG EIA report
- BG AA report ( as annex to the EIA report)
- BG DNSH assessment
- BG Public hearings on the EIA&AA&DNSH content
- BG EIA&AA&DNSH reports upgraded (shall the need arise)
- BG Positive Environmental Decision on the investment proposal
- BG Positive Environmental Decision on the DTAP&PP
- BG Environmental expert report
- BG Land statute amended
- BG DTAP approved
- BG Design Visa issued
- Contracts with the exploitation agencies/companies signed
- BG Urban Planning expert report
- BG BCCP Facility Technical Design
- BG BCCP Facility Technical design conformity assessment report
- Technical designs consulted
- BG BCCP Facility Building permit issued
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Monthly project management team meetings
- BG Project First Phase Completion Report
- BG Roll banners, plates, stationary.
- BG Opening flagship event
- BG Electronic newsletters on the official website of the partner
- Facebook page
- BG Facebook publications
- BG Press releases and articles in print media
- BG Press conference after completion of Environmental procedures.
- BG Press conference for closure of Project first phase and opening the Second.
- BG PC delivered
- BG Laptop delivered
- BG Software delivered
- MKD Tender documentation/s development for engagement of external experts (first phase)
- MKD Tender documentation development for procurement of communication and visibility measures
- MKD Tender documentation development for the procurement of a contract for all design services
- MKD Tender documentation development for the procurement of a contract for all review services
- MKD Tender documentation development for the procurement of a contract for construction works
- MKD Tender documentation development for the procurement of a contract for works supervision
- MKD Tender documentation/s development for engagement of external experts (second phase)
- MKD Tender procedure/s for engagement of external experts (first phase)
- MKD Tender procedure for procurement of communication and visibility measures
- MKD Tender procedure for the procurement of a contract for all design services
- MKD Tender procedure for the procurement of a contract for all review services
- MKD Tender procedure for the procurement of a contract for construction works
- MKD Tender procedure for the procurement of a contract for supervision of construction works
- MKD Tender procedure/s for engagement of external experts (second phase)
- MKD Procurement expert report
- MKD Procurement control observer report
- MKD - Urban plan
- MKD - Urban project
- MKD - Technical documentation for reconstruction
- MKD - Report on the assessment of the project's impact on the environment
- MKD - Urban plan reviewed
- MKD - Urban project reviewed
- MKD - Technical documentation for reconstruction
- MKD Government Decision on Urban Plan
- MKD Stakeholders meeting
- MKD Decision on Urban Project
- MKD EIA Positive Decision
- MKD - BCCP Berovo Facility Building permit
- MKD - Photovoltaic solar panels Building permit
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects quarterly reports
- MKD civil works engineers / architects final reports
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Monthly project management team meetings
- MKD Project First Phase Completion Report
- MKD Roll banners, plates, stationary
- MKD Opening flagship event
- MKD Electronic newsletters on the official website of the partner
- MKD Facebook publications
- MKD Press releases and articles in print media
- MKD Press conference after completion of Urban Plan procedures.
- MKD Press conference for closure of Project first phase and opening the Second.
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer first phase final report
- MKD Laptop
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer quarterly report
- MKD Technical project coordinator and communication officer final report
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers quarterly reports
- MKD civil works engineers final reports
- MKD civil works engineers final reports
- MKD BCCP Berovo Facility reconstruction works
- MKD Photovoltaic solar panels construction and installation
- MKD public procurement procedure for supplies of furniture and office equipment
- MKD Furniture and office equipment supplied
- MKD As build documentation
- MKD Construction works guarantee period
- MKD Construction supervision during construction works
- MKD Construction documentation
- MKD Construction supervision during construction works guarantee period
- MKD Designer's supervision performed
- MKD BCCP Berovo Facility Usage Permit
- MKD Photovoltaic solar panels Usage Permit
- MKD Temporary Acceptance of construction works - BCCP Berovo Facility
- MKD Temporary Acceptance of construction works - BCCP Berovo Photovoltaic plant
- MKD Final Acceptance of construction works - BCCP Berovo Facility
- MKD Final Acceptance of construction works - Photovoltaic solar panels
- BG BCCP Strumyani Facility construction works
- BG Technical tests
- BG Construction documentation
- BG As-build documentation
- BG Author's supervision performed
- BG Works supervision performed
- BG Construction documentation and Works supervision final report
- BG Technical and Energy Efficiency Passports issued
- BG Investor's Control performed
- BG Acceptance of construction works - BCCP Strumyani Facility
- BG BCCP Strumyani Facility Usage Permit
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Monthly Project management team meetings
- Project Final Report
- BG Electronic newsletters on the official website of the partner
- MKD Electronic newsletters on the official website of the partner
- Facebook publications
- BG Press releases and articles in print media
- MDK Press releases and articles in print media
- BG Ceremony for opening of the construction works site
- MKD Ceremony for opening of the construction works site
- BG Billboards on the construction sites
- MKD Billboards on the construction sites
- BG Drone videos during construction works
- MKD Drone videos during construction works
- BG On the-spot checks with media during construction works
- MKD On the-spot checks with media during construction works
- BG Ceremony for closure of the construction works site
- MKD Ceremony for closure of the construction works site
- BG Plates on the construction sites
- MKD Plates on the construction sites
- BG Closure flagship event
- MKD Closure flagship event
Contribution to wider strategies and policies:
- Other Transport Connectivity Programme 2021-2027 - The investments under the project supplements the programme interventions for the development of relations with neighbouring countries.
- Other The BCCP project builds on the achievements of the IPA II bilateral programme, notably the Multi-Annual Programme for Environment and Transport and at the same time plays a crucial role in the implementation of the EU's Economic and Investment Plan for the Western Balkans (Flagship 1 - Connecting East to West). With the
- improved regional connectivity, the cumulative effect of all EU investments in the mobility domain will further strengthen the cooperation between various stakeholders and the building of regional value chains.
- Other The investments will potentially have an impact on Target III – Improving the systems of border control, document inspection management and cooperation on consular related issues in the Danube region of the Priority Area 11 Security of the EUSDR by applying most up-to-date standards in safeguarding security and border control systems. With the improved access to the core TEN-T network, the project makes undisputable contribution to the implementation of the Topic 2 (Intermodal connections to the hinterland) of the Pillar 2: Connecting the Region of the EUSAIR.
- Other Complementarities and synergies are also sought with the activities under the Border Management and Visa Policy Instrument (BMVI) and the IPA III Individual measures to strengthen the response capacity to
- manage migration flows and border management in the Western Balkans
Deliverable (other than infrastructural investment) areas:
- Severna Makedonija (MK), Berovo, N/A, N/A, 2330
- Severna Makedonija (MK), Berovo, N/A, N/A, 2330
Programme Output Indicator:
-
PSI1 BCCP facility constructed/upgraded, Measurement unit: Number
Programme Result Indicator:
-
PSI2 Increase of border crossings, Measurement unit: Number of border crossings
Information regarding the data in keep.eu on the programme financing this project
Financing programme
2021 - 2027 Interreg VI-A IPA Bulgaria North Macedonia
Last month that data in keep.eu was retrieved from the Programme's website or received from the Programme
2025-04-02
No. of projects in keep.eu / Total no. of projects (% of projects in keep.eu)
10 / 10 (100%)
No. of project partnerships in keep.eu / Total no. of project partnerships (% of project partnerships in keep.eu)
43 / 43 (100%)
Notes on the data