Sharing and application of innovative strategies for seismic protection of masonry buildings
Programme 2014 - 2020 INTERREG V-A Italy - SloveniaDescription
Thematic information
Partners (6)
Lead Partner: Università degli Studi di Trieste, Dipartimento di Ingegneria e Architettura
Department: ITH44
Address: Via Alfonso Valerio 6 , 33127 Trieste, Italy
Legal status: public
Website (not verified): http://www.dia.units.it
Total budget: EUR 210 125.00
ERDF budget: EUR 178 606.25
- Univerza v Ljubljani (Fakulteta za gradbeništvo in geodezijo)
-
Name: Univerza v Ljubljani (Fakulteta za gradbeništvo in geodezijo)
Department: SI021
Address: Kongresni trg 12 , 1000 Ljubljana, Slovenia
Legal status: public
Website: https://www.uni-lj.si/
Total budget: EUR 166 200.00
ERDF budget: EUR 141 270.00
- Kolektor Cestno podjetje Nova Gorica, Družba za vdzrževanje in gradnjo cest d.o.o.
-
Name: Kolektor Cestno podjetje Nova Gorica, Družba za vdzrževanje in gradnjo cest d.o.o.
Department: SI023
Address: Industrijska cesta 2 , 5000 Nova Gorica, Slovenia
Legal status: private
Website (not verified): http://www.cpg.si
Total budget: EUR 124 675.00
ERDF budget: EUR 105 973.75
- Igmat d.d, Inštitut za gradbene materiale
-
Name: Igmat d.d, Inštitut za gradbene materiale
Department: SI021
Address: Polje 351c , 1260 Ljubljana, Slovenia
Legal status: private
Website: http://www.igmat.si
Total budget: EUR 124 240.00
ERDF budget: EUR 105 604.00
- Fibrenet S.p.a.
-
Name: Fibrenet S.p.a.
Department: ITH42
Address: Via Jacopo Stellini 3 , 33050 Pavia di Udine, Italy
Legal status: private
Website: http://www.fibrenet.it
Total budget: EUR 124 300.00
ERDF budget: EUR 101 257.50
- Veneziana Restauri Costruzioni Srl
-
Name: Veneziana Restauri Costruzioni Srl
Department: ITH35
Address: Via dell'Industria 9 , 30020 Gruaro, Italy
Legal status: private
Website: http://www.venezianarestauri.it
Total budget: EUR 121 525.00
ERDF budget: EUR 103 296.25
Partners map
Sharing and application of innovative strategies for seismic protection of masonry buildings
Sharing and application of innovative strategies for seismic protection of masonry buildings
Sharing and application of innovative strategies for seismic protection of masonry buildings
Sharing and application of innovative strategies for seismic protection of masonry buildings
Sharing and application of innovative strategies for seismic protection of masonry buildings
Lead partner
Project partner
Summary
Project acronym: CONSTRAIN
Project start date: 2020-03-01
Project end date: 2022-02-28
Project status:
closedTotal budget/expenditure: EUR 871 065.00
Total EU funding (amount): EUR 736 007.75
Co-financing sources:
- ERDF: Amount, EUR 736 007.75.
Documents
Documents on this project are listed below, and organised by category. Please note field "Data source", attached to each document. Keep.eu users are free to use these documents as long as they mention the data source and keep.eu.
- Studies / surveys
-
- The experimental campaign and numerical simulations of the constrain project technical report – part 1
-
Attachment type: link
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-28
Document date: 2022-02-28
Languages: en
- Investigating the effectiveness of a CRM system: full scale reverse cyclic tests on a two-storey rubblestone masonry building
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-28
Document date: 2022-02-28
Languages: en
Attachment file: Download
- Stato di avanzamento delle attività di Progetto 1°semestre - Stanje projektnih aktivnosti 1. semester
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-28
Document date: 2020-09-11
Languages: it, sl
Attachment file: Download
- Stato di avanzamento delle attività di Progetto 2° semestre - Stanje projektnih aktivnosti 2. semester
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-28
Document date: 2020-12-07
Languages: it, sl
Attachment file: Download
- Study on the effectiveness of a CRM system: in-plane and out-of-plane cyclic tests on masonry piers
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-28
Document date: 2022-02-28
Languages: en
Attachment file: Download
- Problems of existing masonry buildings and collection of strenghtening techniques available with description of the application - Technical Report definition of advantages and disadvantages of traditional and modern strengthening techniques, in terms of performance and execution
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-29
Document date: 2022-02-28
Languages: en
Attachment file: Download
- The experimental campaign and numerical simulations of the constrain project technical report – part 2 development of analytical models to design the reinforcements numerical simulation of the seismic performance achieved with the reinforcement
-
Attachment type: file
Type of document: Study / survey
Data source: https://2014-2020.ita-slo.eu/it/constrain
Publication date: 2023-09-29
Document date: 2022-02-28
Languages: en
Attachment file: Download
Information regarding the data in keep.eu on the programme financing this project
Financing programme
2014 - 2020 INTERREG V-A Italy - Slovenia
Last month that data in keep.eu was retrieved from the Programme's website or received from the Programme
2024-03-01
No. of projects in keep.eu / Total no. of projects (% of projects in keep.eu)
58 / 58 (100%)
No. of project partnerships in keep.eu / Total no. of project partnerships (% of project partnerships in keep.eu)
350 / 360 (97.22%)
Notes on the data
Information provided by the Programme. Data from 3 projects (TechMOlogy, WASTE DESIGN an C3B) was retrieved by Interact from the programme´s website on the 2024-03-01. Regarding partners only data only main partners is available. Achievements were retrieved by Interact from the Programme website (http://www.ita-slo.eu/), or a website directly linked from it, on 2021-11-16, 2023-01-24 and 2024-03-19. Field project name (from 1 project) translated from Italian into English using the European Commission's eTranslation machine translation service.
The project which field include an eTranslation English text are the ones with the following acronyms: SECAP.